Castle Gap Solar Hybrid is a solar and battery power plant operated by Upton County Solar 2 LLC with a total output of 190 MW.
Generators
Source | Output | Count | Total output |
---|---|---|---|
battery | 9.90 MW | 1 | 9.90 MW |
External Identifiers
ref:US:EIA | 60123 |
Castle Gap Solar Hybrid is a solar and battery power plant operated by Upton County Solar 2 LLC with a total output of 190 MW.
Source | Output | Count | Total output |
---|---|---|---|
battery | 9.90 MW | 1 | 9.90 MW |