Castle Gap Solar Hybrid is a solar and battery power plant operated by Upton County Solar 2 LLC with a total output of 190 MW.
Generators
| Source | Output | Count | Total output |
|---|---|---|---|
| battery | 9.90 MW | 1 | 9.90 MW |
External Identifiers
| ref:US:EIA | 60123 |
Castle Gap Solar Hybrid is a solar and battery power plant operated by Upton County Solar 2 LLC with a total output of 190 MW.
| Source | Output | Count | Total output |
|---|---|---|---|
| battery | 9.90 MW | 1 | 9.90 MW |
| ref:US:EIA | 60123 |